[jwplayer config="GM1" mediaid="684"]
The next stage of development at the EICC, the arrival of a giant crane – a total monster weighing in at around 200 tonnes. The crane construction was shot over 2 days using our Canon 5d with a selection of lenses. Gripping stuff – you’ll never have seen a 200 tonne beast build so fast!!!