Wind Farm Construction Process

LA Media were asked to time-lapse the wind farm construction process of a new wind turbine being built outside of Livingstone, Scotland and near the M8 motorway. Temporis Wind an affiliate of Temporis Capital Ltd an investment company based in London were the commissioners.

There was nowhere on the location to install a fixed time-lapse and no possibility of building a temporary solution. Project Director Justin Adams (LA Media) decided to record the build using a manned time lapse and visited the site for the two weeks the turbine took to construct.

Being able to move position, change lenses, alter frame rates resulted in a very informative and creative time-lapse film for the client.

The weather was no friend to this project as it  was both rainy and windy most of the time. The construction crew worked through it all and so did LA Media.


If you've enjoyed what you have seen, give us a call on 0131 622 0220 or drop an email to [email protected]. We are always ready to chat through your project.

[/vc_column_text][/vc_column][/vc_row]

If you’ve enjoyed what you have seen, give us a call on 0131 622 0220 or drop an email to [email protected]. We are always ready to chat through your project.